SB180-SSA2, s. 2
1Section 2. 20.835 (1) (dm) of the statutes is created to read:
SB180-SSA2,2,32 20.835 (1) (dm) Public utility distribution account. Beginning in 2005, a sum
3sufficient to make the payments under s. 79.04 (5), (6), and (7).
SB180-SSA2, s. 3 4Section 3. 79.005 (1) of the statutes is renumbered 79.005 (1m).
SB180-SSA2, s. 4 5Section 4. 79.005 (1b) of the statutes is created to read:
SB180-SSA2,2,86 79.005 (1b) "Alternative energy resource" means a renewable resource, as
7defined in s. 196.378 (1) (h); garbage, as defined in s. 289.01 (9); or
8nonvegetation-based industrial, commercial, or household waste.
SB180-SSA2, s. 5 9Section 5. 79.005 (1d) of the statutes is created to read:
SB180-SSA2,2,1210 79.005 (1d) "Baseload electric generating facility" means an electric
11generating facility that has a capacity factor that is greater than 60%, as determined
12by the public service commission.
SB180-SSA2, s. 6 13Section 6. 79.005 (1f) of the statutes is created to read:
SB180-SSA2,2,1714 79.005 (1f) "Capacity factor" means the anticipated actual annual output of an
15electric generating facility expressed as a percentage of the facility's potential
16output. For purposes of this subchapter, the public service commission may review
17the capacity factor of an electric generating facility at any time.
SB180-SSA2, s. 7 18Section 7. 79.005 (2m) of the statutes is created to read:
SB180-SSA2,2,2119 79.005 (2m) "Power generation unit" means a complete set of electric
20generating equipment, as defined in s. 196.52 (9) (a) 1., that, collectively, is sufficient
21to generate electric power.
SB180-SSA2, s. 8 22Section 8. 79.005 (3) of the statutes is amended to read:
SB180-SSA2,2,2423 79.005 (3) "Production plant" also includes does not include substations and
24general structures
.
SB180-SSA2, s. 9 25Section 9. 79.005 (4) of the statutes is created to read:
SB180-SSA2,3,1
179.005 (4) "Repowered" means any of the following:
SB180-SSA2,3,42 (a) Replacing the boiler on an existing fossil fuel steam unit with a combustion
3turbine and heat recovery steam generator and reusing the steam turbine and heat
4rejection system.
SB180-SSA2,3,65 (b) Adding a heat recovery steam generator to a simple cycle combustion
6turbine.
SB180-SSA2,3,87 (c) Demolishing or abandoning an existing power generation unit and replacing
8it with a new power generation unit at the same site.
SB180-SSA2,3,129 (d) Replacing steam generating equipment at a combustion-based renewable
10facility, as defined in s. 196.378 (1) (g), to increase efficiency or capacity, if the facility
11remains a combustion-based renewable facility, as defined in s. 196.378 (1) (g), after
12replacing the equipment.
SB180-SSA2, s. 10 13Section 10. 79.01 (2m) of the statutes is created to read:
SB180-SSA2,3,1714 79.01 (2m) There is established an account in the general fund entitled the
15"Public Utility Distribution Account," referred to in this chapter as the "public utility
16account." There shall be appropriated to the public utility account the sums specified
17in s. 79.04 (5), (6), and (7).
SB180-SSA2, s. 11 18Section 11. 79.04 (1) (intro.) of the statutes is amended to read:
SB180-SSA2,4,419 79.04 (1) (intro.) Annually, except for production plants that begin operation
20after December 31, 2003, or begin operation as a repowered production plant after
21December 31, 2003,
the department of administration, upon certification by the
22department of revenue, shall distribute to a municipality having within its
23boundaries a production plant or a, general structure, including production plants
24and general structures under construction
or substation, used by a light, heat, or
25power company assessed under s. 76.28 (2) or 76.29 (2), except property described in

1s. 66.0813 unless the production plant or substation is owned or operated by a local
2governmental unit located outside of the municipality, or by an electric cooperative
3assessed under ss. 76.07 and 76.48, respectively, or by a municipal electric company
4under s. 66.0825 the amount determined as follows:
SB180-SSA2, s. 12 5Section 12. 79.04 (1) (a) of the statutes is amended to read:
SB180-SSA2,5,36 79.04 (1) (a) An amount from the shared revenue account determined by
7multiplying by 3 mills in the case of a town, and 6 mills in the case of a city or village,
8the first $125,000,000 of the amount shown in the account, plus leased property, of
9each public utility except qualified wholesale electric companies, as defined in s.
1076.28 (1) (gm), on December 31 of the preceding year for either "production plant,
11exclusive of land" and," "general structures", or "work in progress" for production
12plants and general structures under construction,
," and "substations," in the case of
13light, heat and power companies, electric cooperatives or municipal electric
14companies, for all property within a municipality in accordance with the system of
15accounts established by the public service commission or rural electrification
16administration, less depreciation thereon as determined by the department of
17revenue and less the value of treatment plant and pollution abatement equipment,
18as defined under s. 70.11 (21) (a), as determined by the department of revenue plus
19an amount from the shared revenue account determined by multiplying by 3 mills
20in the case of a town, and 6 mills in the case of a city or village, of the first
21$125,000,000 of the total original cost of production plant, general structures, and
22work-in-progress substations less depreciation, land and approved waste treatment
23facilities of each qualified wholesale electric company, as defined in s. 76.28 (1) (gm),
24as reported to the department of revenue of all property within the municipality. The
25total of amounts, as depreciated, from the accounts of all public utilities for the same

1production plant is also limited to not more than $125,000,000. The amount
2distributable to a municipality under this subsection and sub. (6) in any year shall
3not exceed $300 times the population of the municipality.
SB180-SSA2, s. 13 4Section 13. 79.04 (1) (b) 2. of the statutes is amended to read:
SB180-SSA2,5,115 79.04 (1) (b) 2. When a light, heat or power company no longer uses property
6described under par. (a) as production plant, substation, or general structure in a
7municipality, the amount established under subd. 1. shall be reduced by the
8proportion that the property that is no longer used bears to the total value of all
9property described in par. (a) in the municipality. The proportion shall be determined
10according to the proportional value of the property when the light, heat or power
11company stops using the property.
SB180-SSA2, s. 14 12Section 14. 79.04 (1) (c) 1. of the statutes is amended to read:
SB180-SSA2,5,1913 79.04 (1) (c) 1. The payment for any municipality in which a production plant
14is located, which the public service commission certifies to the department of revenue
15will produce a nominal rated capacity of 200 megawatts or more, shall be no less than
16$75,000 annually, except that the amount distributable to a municipality in any year
17shall not exceed the per capita limit specified in par. (a). Payments under this
18paragraph may be extended to decommissioned production plants as provided in
19subd. 3.
SB180-SSA2, s. 15 20Section 15. 79.04 (1) (c) 3. of the statutes is amended to read:
SB180-SSA2,6,321 79.04 (1) (c) 3. If a production plant with a nominal rated capacity of 200
22megawatts or more is decommissioned or becomes nonutility property, the $75,000
23minimum guaranteed payment under subd. 1. shall continue but diminish by $7,500
24annually, except that the minimum guaranteed payment under this subdivision
25shall cease in the year following the first year in which the property becomes taxable

1by the taxation district. In this subdivision, "nonutility property" has the meaning
2set forth in the uniform system of accounts established by the public service
3commission. This subdivision does not apply after the distributions in 2004.
SB180-SSA2, s. 16 4Section 16. 79.04 (2) (a) of the statutes is amended to read:
SB180-SSA2,7,135 79.04 (2) (a) Annually, except for production plants that begin operation after
6December 31, 2003, or begin operation as a repowered production plant after
7December 31, 2003,
the department of administration, upon certification by the
8department of revenue, shall distribute from the shared revenue account to any
9county having within its boundaries a production plant or a, general structure,
10including production plants and general structures under construction or
11substation
, used by a light, heat or power company assessed under s. 76.28 (2) or
1276.29 (2), except property described in s. 66.0813 unless the production plant or
13substation
is owned or operated by a local governmental unit that is located outside
14of the municipality in which the production plant or substation is located, or by an
15electric cooperative assessed under ss. 76.07 and 76.48, respectively, or by a
16municipal electric company under s. 66.0825 an amount determined by multiplying
17by 6 mills in the case of property in a town and by 3 mills in the case of property in
18a city or village the first $125,000,000 of the amount shown in the account, plus
19leased property, of each public utility except qualified wholesale electric companies,
20as defined in s. 76.28 (1) (gm), on December 31 of the preceding year for either
21"production plant, exclusive of land" and," "general structures", or "work in progress"
22for production plants and general structures under construction,
," and
23"substations,"
in the case of light, heat and power companies, electric cooperatives
24or municipal electric companies, for all property within the municipality in
25accordance with the system of accounts established by the public service commission

1or rural electrification administration, less depreciation thereon as determined by
2the department of revenue and less the value of treatment plant and pollution
3abatement equipment, as defined under s. 70.11 (21) (a), as determined by the
4department of revenue plus an amount from the shared revenue account determined
5by multiplying by 6 mills in the case of property in a town, and 3 mills in the case of
6property in a city or village, of the total original cost of production plant, general
7structures, and work-in-progress substations less depreciation, land and approved
8waste treatment facilities of each qualified wholesale electric company, as defined in
9s. 76.28 (1) (gm), as reported to the department of revenue of all property within the
10municipality. The total of amounts, as depreciated, from the accounts of all public
11utilities for the same production plant is also limited to not more than $125,000,000.
12The amount distributable to a county under this subsection and sub. (6) in any year
13shall not exceed $100 times the population of the county.
SB180-SSA2, s. 17 14Section 17. 79.04 (2) (am) 2. of the statutes is amended to read:
SB180-SSA2,7,2115 79.04 (2) (am) 2. When a light, heat or power company no longer uses property
16described under par. (a) as production plant, substation, or general structure in a
17county, the amount established under subd. 1. shall be reduced by the proportion that
18the property that is no longer used bears to the total value of all property described
19in par. (a) in the county. The proportion shall be determined according to the
20proportional value of the property when the light, heat or power company stops using
21the property.
SB180-SSA2, s. 18 22Section 18. 79.04 (3m) of the statutes is created to read:
SB180-SSA2,8,323 79.04 (3m) For purposes of determining the amount of the payments under
24subs. (1) and (2), the payments for a municipality and county in which an ash disposal
25facility that is owned and operated by an electric cooperative is operating prior to the

1effective date of this subsection .... [revisor inserts date], shall be calculated to
2include an amount that is equal to the net book value of the ash disposal facility
3multiplied by 2.
SB180-SSA2, s. 19 4Section 19. 79.04 (4) of the statutes is amended to read:
SB180-SSA2,8,115 79.04 (4) (a) Annually, in addition to the amount amounts distributed under
6sub. (1) subs. (1), (5), (6), and (7), the department of administration shall distribute
7$50,000 to a municipality if spent nuclear fuel is stored within the municipality on
8December 31 of the preceding year. If a spent nuclear fuel storage facility is located
9within one mile of a municipality, that municipality shall receive $10,000 annually
10and the municipality where that storage facility is located shall receive $40,000
11annually.
SB180-SSA2,8,1912 (b) Annually, in addition to the amount amounts distributed under sub. (2)
13subs. (2), (5), (6), and (7), the department of administration shall distribute $50,000
14to a county if spent nuclear fuel is stored within the county on December 31 of the
15preceding year. If a spent nuclear fuel storage facility is located at a production plant
16located in more than one county, the payment shall be apportioned according to the
17formula under sub. (1) (c) 2., except that the formula, as it applies to municipalities
18in that subdivision, applies to counties in this paragraph. The payment under this
19paragraph may not be less than $10,000 annually.
SB180-SSA2, s. 20 20Section 20. 79.04 (5) of the statutes is created to read:
SB180-SSA2,9,621 79.04 (5) (a) Beginning with the distributions in 2005, if property that was
22exempt from the property tax under s. 70.112 (4) and that was used to generate power
23by a light, heat, or power company, except property under s. 66.0813, unless the
24production plant is owned or operated by a local governmental unit located outside
25of the municipality, or by an electric cooperative, or by a municipal electric company

1under s. 66.0825, is decommissioned, the municipality shall be paid, from the public
2utility account, an amount calculated by subtracting an amount equal to the
3property taxes paid for that property during the current year to the municipality for
4its general operations from the following percentages of the payment that the
5municipality received under this section during the last year that the property was
6exempt from the property tax:
SB180-SSA2,9,77 1. In the first year that the property is taxable, 100%.
SB180-SSA2,9,88 2. In the 2nd year that the property is taxable, 80%.
SB180-SSA2,9,99 3. In the 3rd year that the property is taxable, 60%.
SB180-SSA2,9,1010 4. In the 4th year that the property is taxable, 40%.
SB180-SSA2,9,1111 5. In the 5th year that the property is taxable, 20%.
SB180-SSA2,9,2112 (b) Beginning with the distributions in 2005, if property that was exempt from
13the property tax under s. 70.112 (4) and that was used to generate power by a light,
14heat, or power company, except property under s. 66.0813, unless the production
15plant is owned or operated by a local governmental unit located outside of the
16municipality, or by an electric cooperative, or by a municipal electric company under
17s. 66.0825, is decommissioned, the county shall be paid, from the public utility
18account, an amount calculated by subtracting an amount equal to the property taxes
19paid for that property during the current year to the county for its general operations
20from the following percentages of the payment the county received under this section
21during the last year that the property was exempt from the property tax:
SB180-SSA2,9,2222 1. In the first year that the property is taxable, 100%.
SB180-SSA2,9,2323 2. In the 2nd year that the property is taxable, 80%.
SB180-SSA2,9,2424 3. In the 3rd year that the property is taxable, 60%.
SB180-SSA2,9,2525 4. In the 4th year that the property is taxable, 40%.
SB180-SSA2,10,1
15. In the 5th year that the property is taxable, 20%.
SB180-SSA2, s. 21 2Section 21. 79.04 (6) of the statutes is created to read:
SB180-SSA2,10,153 79.04 (6) (a) Annually, beginning in 2005, for production plants that begin
4operation after December 31, 2003, or begin operation as a repowered production
5plant after December 31, 2003, the department of administration, upon certification
6by the department of revenue, shall distribute payments from the public utility
7account, as determined under par. (b), to each municipality and county in which a
8production plant is located, if the production plant has a name-plate capacity of at
9least one megawatt and is used by a light, heat, or power company assessed under
10s. 76.28 (2) or 76.29 (2), except property described in s. 66.0813, unless the production
11plant is owned or operated by a local governmental unit located outside of the
12municipality; by a qualified wholesale electric company, as defined in s. 76.28 (1)
13(gm); by a wholesale merchant plant, as defined in s. 196.491 (1) (w); by an electric
14cooperative assessed under ss. 76.07 and 76.48, respectively; or by a municipal
15electric company under s. 66.0825.
SB180-SSA2,10,1916 (b) Subject to pars. (c) and (d), each municipality entitled to a payment under
17par. (a) and each county in which such a municipality is located shall receive a
18payment equal to a portion of an amount that is equal to the number of megawatts
19that represents the production plant's name-plate capacity, multiplied by $2,000.
SB180-SSA2,11,320 (c) 1. If the production plant is located in a city or village, the city or village
21receives a payment equal to two-thirds of the amount determined under par. (b) and
22the county in which the city or village is located receives a payment equal to
23one-third of the amount determined under par. (b). If the production plant is located
24in a town, the town receives a payment equal to one-third of the amount determined
25under par. (b), and the county in which the town is located receives a payment equal

1to two-thirds of the amount determined under par. (b). If a municipality is located
2in more than one county, the county in which the production plant is located shall
3receive the county portion of the payment.
SB180-SSA2,11,94 2. For the purpose of determining the amount of the payment under par. (b),
5if a production plant is located in more than one municipality, the payment amount
6under par. (b) shall be divided among the municipalities in which the plant is located
7based on the net book value of that portion of the plant located in each municipality
8as of December 31, 2004, or as of the date on which the plant is operational,
9whichever is later.
SB180-SSA2,11,1410 (d) The total amount distributable to a municipality under this subsection and
11sub. (1) in any fiscal year shall not exceed an amount equal to the municipality's
12population multiplied by $300, and the total amount distributable to a county under
13this subsection and sub. (2) in any year shall not exceed an amount equal to the
14county's population multiplied by $100.
SB180-SSA2, s. 22 15Section 22. 79.04 (7) of the statutes is created to read:
SB180-SSA2,12,216 79.04 (7) (a) Beginning with payments in 2005, if a production plant, as
17described in sub. (6) (a), other than a nuclear-powered production plant, is built on
18the site of, or on a site adjacent to, an existing or decommissioned production plant;
19or is built on a site purchased by a public utility before January 1, 1980, that was
20identified in an advance plan as a proposed site for a production plant; or is built on,
21or on a site adjacent to, brownfields, as defined in s. 560.13 (1) (a), after December
2231, 2003, and has a name-plate capacity of at least one megawatt, each municipality
23and county in which such a production plant is located shall receive annually from
24the public utility account a payment in an amount that is equal to the number of

1megawatts that represents the production plant's name-plate capacity, multiplied
2by $600.
SB180-SSA2,12,93 (b) Beginning with payments in 2005, if a production plant, as described in sub.
4(6) (a), that is a baseload electric generating facility is built after December 31, 2003,
5and has a name-plate capacity of at least 50 megawatts, each municipality and
6county in which such a production plant is located shall receive annually from the
7public utility account a payment in an amount that is equal to the number of
8megawatts that represents the production plant's name-plate capacity, multiplied
9by $600.
SB180-SSA2,12,1610 (c) 1. Except as provided in subd. 2., beginning with payments in 2005, if a
11production plant, as described in sub. (6) (a), that derives energy from an alternative
12energy resource is built after December 31, 2003, and has a name-plate capacity of
13at least one megawatt, each municipality and county in which such a production
14plant is located shall receive annually from the public utility account a payment in
15an amount that is equal to the number of megawatts that represents the production
16plant's name-plate capacity, multiplied by $1,000.
SB180-SSA2,12,2417 2. If a production plant as described under subd. 1. fires an alternative energy
18resource together with a fuel other than an alternative energy resource, the number
19of megawatts used to calculate the payment under subd. 1. is the number of
20megawatts that represents the production plant's name-plate capacity multiplied by
21a percentage that represents the energy content of the alternative energy resource
22in the year prior to the year in which the payment is made as compared to the total
23energy content of the alternative energy resource and the other fuel in the year prior
24to the year in which the payment is made.
SB180-SSA2, s. 23 25Section 23. 196.20 (7) of the statutes is created to read:
SB180-SSA2,13,7
1196.20 (7) (a) In this subsection, "mitigation payment" means, as approved by
2the commission, an unrestricted or recurring monetary payment to a local unit of
3government in which an electric generating facility is located to mitigate the impact
4of the electric generating facility on the local unit of government. "Mitigation
5payment" does not include payments made or in-kind contributions for restricted
6purposes to directly address health or safety impacts of the electric generating
7facility on the local unit of government.
SB180-SSA2,13,98 (b) Except as provided in par. (c), an electric public utility may not recover in
9rates any of the following:
SB180-SSA2,13,1010 1. The cost of mitigation payments paid by the utility.
SB180-SSA2,13,1511 2. The cost of mitigation payments paid by the owner or operator of an electric
12generating facility that the owner or operator recovers from the utility by selling
13electricity to the utility, by leasing the facility to the utility, or by any agreement
14between the owner or operator of the electric generating facility and the public
15utility.
SB180-SSA2,13,1816 (c) The commission shall only approve a mitigation payment agreement that
17is received by the commission before June 10, 2003, and, if the commission finds the
18agreement to be reasonable, shall not subsequently modify the agreement.
SB180-SSA2, s. 24 19Section 24. Initial applicability.
SB180-SSA2,13,2320 (1) The treatment of sections 20.835 (1) (d) and (dm), 79.005 (1), (1b), (1d), (1f),
21(2m), (3), and (4), 79.01 (2m), and 79.04 (1) (intro.), (a), (b) 2., and (c) 1., (2) (a) and
22(am) 2., (3m), (4), (5), (6), and (7) of the statutes first applies to distributions made
23on the 4th Monday in July, 2005.
Loading...
Loading...